Measure I Phase I

Print

Scope of Work

    Project Area A: 
        • Removal and replacement of damaged curb, gutter, and sidewalk, slotted cross gutters, street pavement with subgrade failure, and surface grind and overlay of all street pavement 
        • Handicap curb access ramps will be added where appropriate and some existing ramps will be removed to meet current Americans with Disabilities Act access requirements 
        • Rehabilitation of storm drains 
    Project Area B: 
        • Removal and replacement of damaged curb, gutter, and sidewalk, and surface grind and overlay of street pavement 
        • Areas in relatively good condition will be slurry sealed to maximize the remaining useful life expectancy of the street pavement 
        • Rehabilitation of storm drains

Project Area

    Project Area A: 
    All neighborhood streets bounded by: 
        • Leffingwell Road to the north 
        • La Mirada Boulevard to the east 
        • Imperial Highway to the south 
        • Telegraph Road to the west 
    Project Area B: 
    All neighborhood streets bounded by: 
        • Leffingwell Road to the north 
        • La Mirada Boulevard to the west 
        • Imperial Highway to the south 
        • Stamy Road from Leffingwell Road to Lemon Drive 
        • Santa Gertrudes Avenue from Lemon Drive to Imperial Highway east

Contractor

    • Sequel Contractors

Project Cost

    • Measure I is expected to generate $20-$25 million in revenues over the next five years

Funding Source

    • La Mirada voters approved Measure I, a one percent transactions and use tax, in November 2012 and the tax went into effect on April 1, 2013

Project Duration

    • September 2014 - January 2015

Measure I phase 1

Measure I phase 1(2)